diff options
author | frosch <frosch@openttd.org> | 2011-08-08 21:26:58 +0000 |
---|---|---|
committer | frosch <frosch@openttd.org> | 2011-08-08 21:26:58 +0000 |
commit | d10168f21183d1097b88ebe86ed5b5a9b1b3ef5e (patch) | |
tree | 8545d23253e91ffa08acb30046f4c16bd176bb48 /src/newgrf_spritegroup.h | |
parent | 68068b6eff894c0702bc69462aa7657eaf26c8ff (diff) | |
download | openttd-d10168f21183d1097b88ebe86ed5b5a9b1b3ef5e.tar.xz |
(svn r22731) -Fix: [NewGRF] The construction stage sprites were incorrectly selected in cases other than 1 or 4 sprites per set.
Diffstat (limited to 'src/newgrf_spritegroup.h')
-rw-r--r-- | src/newgrf_spritegroup.h | 19 |
1 files changed, 19 insertions, 0 deletions
diff --git a/src/newgrf_spritegroup.h b/src/newgrf_spritegroup.h index 811547832..94ec430d4 100644 --- a/src/newgrf_spritegroup.h +++ b/src/newgrf_spritegroup.h @@ -292,6 +292,25 @@ struct TileLayoutSpriteGroup : SpriteGroup { NewGRFSpriteLayout dts; const DrawTileSprites *ProcessRegisters(uint8 *stage) const; + + /** + * Determines which sprite to use from a spriteset for a specific construction stage. + * @param construction_stage Construction stage 0 - 3. + * @return Sprite to use + */ + uint GetConstructionStageOffset(uint construction_stage) const + { + uint num_sprites = this->num_building_stages; + assert(num_sprites > 0); + if (num_sprites > 4) num_sprites = 4; + switch (construction_stage) { + case 0: return 0; + case 1: return num_sprites > 2 ? 1 : 0; + case 2: return num_sprites > 2 ? num_sprites - 2 : 0; + case 3: return num_sprites - 1; + default: NOT_REACHED(); + } + } }; struct IndustryProductionSpriteGroup : SpriteGroup { |